Mangelberger hatte bereits in der Planungs- und Angebotsphase das innovativste und schlüssigste Gesamtkonzept - und das von der Beleuchtung über die Datentechnik bis hin zu den Maschinenanschlüssen

In discussion with Gerhard Ziegler

Gerhard Ziegler, the director of "Ziegler Präzisionsteile" on the decision to hire Mangelberger for the complete electrical engineering: "We needed an efficient and reliable partner, which identifies itself with us and is able, to convert our ideas. Mangelberger already had the most innovative and most coherent overall concept in the planning and offer phase - from the lighting through the data processing technology up to the machine connections."

In the meantime a friendly relationship has developed between both companies. The co-operation with the new company building will surely not have been the last one. Gerhard Ziegler on his experiences during the building phase: "One has a thousand things to do during such a project; also at the same time the normal business must continue. The project managers at Mangelberger supported me at all times with advice and assistance, so that in many cases useless costs could be avoided. All electrical and installation work of the Mangelberger company could be accepted without faults and improvements. Telephone and all EDP systems were handed over on time with completed documentation and functioned straight away when the devices were first plugged in. One doesn’t expect this even in one’s wildest dreams!"

After some time in his own company headquarters, Gerhard Ziegler contentedly sums it up in a generally positive manner: "In hindsight, it was confirmed that the concept planned and executed by Mangelberger and was the only correct one. It was possible to connect all machines which were additionally purchased and after the acceptance of the electrical work, quickly, without problem and easily."

PDF - more information (278 KB)