Due to the enormous time pressure, the Mangelberger team worked in a 3 shift operation on planning and installation of switchgears, media technology and lighting. A special highlight: the lighting control system designed by Mangelberger. The entire lighting within the restaurant regulates itself and reacts automatically to the respective exterior and interior lighting conditions.



